Page not found
Search results
-
Permit Application Forms
Community Development | PageApplication Requirements Plan Review Sign Permit Application Packet Subdivision Land Development Permit ... Title_______________________________________________________________________________ Revised 8/29/2023requirements_plan_review.pdf CITY OF FROSTBURG PLAN REVIEW REQUIREMENTS ... and supporting documentation reviews require 7-10 working days to process. Missing information will ...
-
Building Permits
Community Development | Pagescheduled. Plan Review Requirements Please review the Plan Review Requirements sheet to ensure that all ... Requirements document to ensure that all information is included in your plan submission. Incomplete plans will ... Reviews & Submission Requirements All multifamily and commercial plans must be stamped by an engineer ...
-
Building Improvements & ADA Upgrades Grant Program
Administration | Bid/RFPwith laws protecting historic resources; in some cases, building plans may also be reviewed by State ... with construction until an agreement is signed with the City and all required approvals have been ... documentation of expenditures, including invoices and canceled checks (typically 2-3 weeks). Expenditure of ...
-
Request for Proposals: Frostburg Comprehensive Plan
Community Development | Bid/RFPprofessional services for the City’s ten-year Comprehensive Plan. The document describes the task requirements ... Z final_frostburg_comp_plan_rfp.jan2024.pdf 1 Purpose The purpose of this document is to solicit proposals from qualified consultants to ... provide professional services for the City’s ten-year Comprehensive Plan. The document describes the task ...
-
Solar Installations
Community Development | PageFloor. Be sure to review the Plan Review Requirements document to ensure that all information is included in ... Solar arrays require the issuance of a building permit prior to installation. Plan Review ... Requirements Please review the "Solar Photovoltaic" portion of the Plan Review Requirements ...
-
Historic District Certification of Appropriateness Application
Historic District Commission | PageOther:____________________________ Work to be performed: PLANS – Architect, Engineer, or ... (s):_____________________________________________________________________________________________________________________ Scope of Work (describe project in detail, list materials and dimensions ... 2 Requirements for Complete Application (TO BE DETERMINED BY STAFF; IF CHECKED INCLUDE AS AN ATTACHMENT): SITE ...
-
Frostburg Utility Rate Study
Administration | Bid/RFPa “Utility Rate Study” for the City of Frostburg. The documents at links below describe the task requirements ... for the City of Frostburg. The document describes the task requirements and deliverables for this ... have a minimum of 10 years’ documented experience in conducting the required water and sewer revenue ...
-
Permit Specialist/ Code Enforcement Officer
Administration | Job Openingpermitting and plan review, general customer assistance within the Department, and will be a sworn Code ... review process. • Review all major site plans for compliance with the City’s land use ordinances, ... be detail-oriented, familiar with building and construction practices, and have experience working in ...
-
Public Information
Administration | PageRequests for information under the MPIA only require production of existing documents under the control of ... the City. The MPIA does not require the City to compile information from existing documents or create ... news, events, and announcements coming out of the City of Frostburg. The office coordinates content ...
-
Ticket Comment
Ticket Commentsuch, exterior alterations may require an additional review from the Historic District Commission if the ... review and requirements is available here: https://www.frostburgcity.org/bc-historicdistrict. It is also ... required; however, any alterations that change the sign footprint in any way require a permit. The City does ...